Sunday, September 28, 2008
The Bathroom
So, I finally have one room done downstairs which means I'm getting closer to finishing my basement. Jason came the other day and stained the floor and then Kyle (Sara's brother) came over and finished the plumbing up. That night I had to break the shower in so I took one and let me tell you the rain drop or top shower head is the best Idea I have had in a while. The shower curtain was a great find at Shopko. I really didn't think it would be almost the same as the tile but it matches dang near perfect. Anyways I should be getting closer to getting carpet and then cabinets and countertops and I will be done. The other day I had the home theater guys come and finish up thier part by installing a projector and connecting / hanging up the surround sound speakers. I can't wait to get pictures on here for all to see.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment